MTA NYCT Mosholu Parkway Station ADA Upgrades

Infinite Consulting Corp. (Infinite) developed feasibility, master plan, and design-build estimates for the ADA upgrades to the Mosholu Parkway Station. The estimates developed were used to establish a budget for the design-build contract. The scope included maintenance and protection of traffic; traction elevators; metal stairs and metal railings, structural track repairs; expansion of the mezzanine and track platform; utility relocations; HAZMAT abatement; elevator power and controls; security upgrades (CCTV and PA system); upgrades to the mechanical, electrical, and fire protection systems; and automated fare collection improvements.

SERVICES

Cost Estimating, Scheduling

CLIENT

AECOM

OWNER

New York City Transit