MTA NYCT Jerome/Pelham - Harlem River Pumping System Improvements

Infinite Consulting Corp. (Infinite) provided cost estimating services at the 30%, 60%, and final design milestones for the pumping system improvements and overall resiliency of Pump Rooms 3210, 3211, 3212, and 3216 located in the Jerome / Pelham Tube. The project goal is to maintain pump station operation in a severe storm event by designing emergency power and communications infrastructure between emergency generators and pump stations.

The scope of work includes the upgraded emergency generators and support structures; a deployable weir wall within the Jerome-Pelham tube; upgraded track drainage sump inlet pipe; upgraded electrical generator connections boxes; replacement of electrical feeders; replacement of local motor control centers with new pump controls/motor control centers above the DFE; and upgrade of heat trace panels.

SERVICES

Cost Estimating

CLIENT

AECOM

OWNER

New York City Transit