NYCHA Roosevelt Houses I and II Boiler Replacement

Infinite Consulting Corp. (Infinite) provided cost estimating services at the Preliminary, Design Development, 50%, 90%, and 100% design phases for the boiler replacement at the NYCHA Roosevelt Houses. The scope of this project included the removal and replacement of 8840 MBH Boilers in the central boiler room for the site and modifications to basement utility rooms in nine different buildings. These basement modifications included HAZMAT abatement, new concrete equipment pads, waterproofing, louvers replacement, railings, ladders, cold/hot water upgrades, natural gas upgrades, sanitary sewer upgrades, low-pressure steam line replacement, condensate pipe replacement, new controls, and electrical upgrades. Additional considerations were made to ensure constant service is provided to the residents.

SERVICES

Cost Estimating

CLIENT

Lakhani & Jordan Engineers PC

OWNER

New York City Housing Authority