SUNY Downstate Medical Center Electrical Upgrades

Infinite Consulting Corp. (Infinite) provided cost estimating services at the 30%, 60%, and 100% design phases for the SUNY Downstate Medical Center Electrical Upgrades Packages 1, 2, and 3. Package 1 included massive renovations to the existing electrical systems, including modifying the existing medium voltage feeders, medium voltage switchgear, and installation of temporary and permanent generators. Package 1 scope also included renovations to the mechanical, plumbing, and architectural work. Packages 2 and 3 included separation of power, new medium voltage equipment, and feeders, as well as installation of new mechanical cooling towers.

SERVICES

Cost Estimating

CLIENT

Lizardos Engineering & Associates, PC

OWNER

SUNY Downstate Medical Center